Recording operator 09:41 REC 00:04:23

Inspection procedure for checking valves and screws in the Flow Loop

DRAFT V3.4 Approve
Type: Internal machine name: M720 Integration type: LMS IXON:ON

Step 7: Check if MOV 220 is closed.

Check if MOV 220 is closed

Check if the valve MOV 220 is closed.

Step 8: Check MUD panel 10 FT 220

Check MUD panel 10 FT 220

Go to the MUD panel 10 FT 220 and check if the light at number 1 is on.

Step 9: Check if the pinch valve is closed.

Check if the pinch valve is closed

Check if the rubber of the squeeze valve is fully pressed in (like a harmonica), which indicates that the valve is closed.